Civil 791 Construction Management 2025

Semester 1

Assignment 2 (25% of total assessment)

1.0      General

1.1      Assignment Type

Individual Assignment

1.2      Submission Date and Time

Monday 26 May 11:59pm

1.3      Submission Method

All work for this assignment is to be compiled into one pdf which shall be submitted to Canvas by the due date.

1.4       Penalties for late submission

Time after Due Date

Penalty

<=24 hrs (1 day)

-10%

>24 hours but <= 48 hours (2 days)

-20%

>48 hours but <= 72 hours (3 days)

-30%

>72 hours but <=96 hours (4 days)

-40%

>96 hours but <=168 hours (7 days)

-50%

>168 hours (7 days)

-100%

2.0          Assignment Outline

2.1            Background Scenario

A  building  is  to  be built which requires construction of a  basement  retaining wall along one side which backs onto an embankment.

The basement retaining wall is 3.5 m high and 90m in total length and is founded on 400mm diameter, 35m deep bored piles.

Bored piles have been selected by the engineer due to their high strength capacity, as well as   their ability to be installed with minimal vibration, which is important as the site is located  adjacent  to  a   hospital  which  is  sensitive  to  disturbance.  Furthermore,  this  will  minimise disturbance to any other works which are occurring on site at the same time.

The piles are to be installed in stable soil and hence are unsupported, meaning that no casing is required.

Your company  had  proposed  Continuous  Flight Auger  (CFA)  piling  instead  as  CFA  piling  is considerably faster,  however  the  engineer  has  insisted  on  bored  piles,  as  the  process  of installing CFA piles would not give the engineer an opportunity to confirm the quality of soil  during installation.

The soil conditions at the site include slow draining silts and clays with a high but fluctuating  ground water table. With stringent requirements regarding waterproofing and the ingress of  moisture,  monolithic  in-situ  reinforced  concrete  construction  is  proposed  together  with drainage and Nuralite Preprufe 3000 and Bituthene waterproofing products to the underside of  foundations  and  the  wall  exterior   respectively.  The  design  details  are  shown  in  the engineer's sketches (refer Sketches 1 and 2).

It is hoped that the project will commence on the 1 July 2025. It is noted that the Client would like this phase of the work to be completed as soon as possible.

2.2      Assignment Scope

You are working for a construction company specialising in concrete construction and piling and as part of the contract management team, you are tasked with compiling information in a  brief  report  addressing  considerations  for  a  tender  submission  for  construction  of  the basement retaining wall.

Your report should include the following:

Part A  Preliminary Project Programme

A programme for the project is to be provided. You will need to determine a sequence which completes the work as efficiently as possible which is to be presented on a Gantt chart. It is recommended that this be produced using MSProject (which is available in the engineering computer labs) or Project Libre which is free for download https://www.projectlibre.com/). A step-by-step guide on how to use MS Project is available under the Lecture 6 materials.

Information to be provided together with the schedule should include:

a)   A work breakdown structure.

b)   A list of any assumptions and rationale  regarding the development of the schedule. This  may  include  justification  for   durations  as  well  as  other  considerations  or approaches.

c)   Commentary  on  the  critical  path  which  should  be  highlighted  on  the  programme provided.

Considerations:

1.   It  is  recommended  that  you  explain  in  your  report  how  you  determined  the

duration  of the  piling  work,  taking  into  account  the  constraints  given  in  Sketch 2.

2.   It  is  suggested you  make  use of  the recommended software. It  may be necessary  for you    to     experiment   with    different   scheduling   alternatives.   If    you    feel    some  of    this information   is   relevant  in   order  to  justify   your   chosen  schedule, you  might  consider including it in an appendix.

3.   Gantt   charts should  show   sufficient  information  to  illustrate  the proposed schedule. This should include the critical path.

4.   Note that you should not calculate the critical path by hand. Instead you should utilise functionalityofthe software. Avisualinspection ofthe taskswhichmake upthe critical path is also recommended.

Part B  Cost Estimate

a.   Use the bottom-up estimation method to estimate the overall project cost. The cost of

various items should be estimated individually and then aggregated to determine the total project cost. You should  include  notes regarding

•   Any assumptions

•    Inclusions  and exclusions

b.   Reassess your piling cost estimate by using the Rawlinsons 2014 Detailed Trade Rates for Insitu Concrete Piles – Bored.

You must update the 2014 cost to reflect 2025 values using the Cost Fluctuation

Adjustment equation found in NZS3910:2013 Appendix A, along with the appropriate indices from Statistics New Zealand.

Once you have calculated the updated cost for 2025, briefly compare it with your original estimate. You do not need to revise your original calculations—simply note any differences.

Considerations:

1.   You should be able to build up a cost estimate  with  the information given in  this Assignment brief alone, however if you  wish, you may use additional cost information from other sources.

Part C  Weekly Cash Flow

A weekly cashflow during the course of the project should be provided with reference to the the programme and the budget estimate you have provided.

You should provide some commentary on this.

Considerations:

1.   If you  are  utilising MS Project you might consider utilising  the Cash Flow reporting function. However, the use of MS project is optional for this task, you are free to generate your cash flow without using this tool.



热门主题

课程名

mktg2509 csci 2600 38170 lng302 csse3010 phas3226 77938 arch1162 engn4536/engn6536 acx5903 comp151101 phl245 cse12 comp9312 stat3016/6016 phas0038 comp2140 6qqmb312 xjco3011 rest0005 ematm0051 5qqmn219 lubs5062m eee8155 cege0100 eap033 artd1109 mat246 etc3430 ecmm462 mis102 inft6800 ddes9903 comp6521 comp9517 comp3331/9331 comp4337 comp6008 comp9414 bu.231.790.81 man00150m csb352h math1041 eengm4100 isys1002 08 6057cem mktg3504 mthm036 mtrx1701 mth3241 eeee3086 cmp-7038b cmp-7000a ints4010 econ2151 infs5710 fins5516 fin3309 fins5510 gsoe9340 math2007 math2036 soee5010 mark3088 infs3605 elec9714 comp2271 ma214 comp2211 infs3604 600426 sit254 acct3091 bbt405 msin0116 com107/com113 mark5826 sit120 comp9021 eco2101 eeen40700 cs253 ece3114 ecmm447 chns3000 math377 itd102 comp9444 comp(2041|9044) econ0060 econ7230 mgt001371 ecs-323 cs6250 mgdi60012 mdia2012 comm221001 comm5000 ma1008 engl642 econ241 com333 math367 mis201 nbs-7041x meek16104 econ2003 comm1190 mbas902 comp-1027 dpst1091 comp7315 eppd1033 m06 ee3025 msci231 bb113/bbs1063 fc709 comp3425 comp9417 econ42915 cb9101 math1102e chme0017 fc307 mkt60104 5522usst litr1-uc6201.200 ee1102 cosc2803 math39512 omp9727 int2067/int5051 bsb151 mgt253 fc021 babs2202 mis2002s phya21 18-213 cege0012 mdia1002 math38032 mech5125 07 cisc102 mgx3110 cs240 11175 fin3020s eco3420 ictten622 comp9727 cpt111 de114102d mgm320h5s bafi1019 math21112 efim20036 mn-3503 fins5568 110.807 bcpm000028 info6030 bma0092 bcpm0054 math20212 ce335 cs365 cenv6141 ftec5580 math2010 ec3450 comm1170 ecmt1010 csci-ua.0480-003 econ12-200 ib3960 ectb60h3f cs247—assignment tk3163 ics3u ib3j80 comp20008 comp9334 eppd1063 acct2343 cct109 isys1055/3412 math350-real math2014 eec180 stat141b econ2101 msinm014/msing014/msing014b fit2004 comp643 bu1002 cm2030
联系我们
EMail: 99515681@qq.com
QQ: 99515681
留学生作业帮-留学生的知心伴侣!
工作时间:08:00-21:00
python代写
微信客服:codinghelp
站长地图